Project Description

TYPE OF INTERVENTION:

  • Design, construction, and installation of 2700 square meters of SCHÜCO FWS 50 SG SI series structural curtain wall series with mullions and transoms with coplanar glazing and concealed retaining system.
  • The opaque sections are made from insulated alucobond panels while the transparent sections have a double chamber with external selective plate and integrated motorized venetian blind, with 76 protruding openings; the system provides high thermal and acoustic performance.
  • A sunshade with a steel supporting structure covered with composite aluminum panels that repeat the underlying modularity, completes and characterizes the building.

Tecnomont also supplied the production department windows with horizontal belt system and DK-type openings.

ARCHITECTS:

Arch. Maurizio De Cristofaro

CUSTOMER:

Tech Bau Spa

DURATION:

From April to December 2019